Den 5/1-2026 kommer GUPEA att vara otillgängligt för alla under hela dagen.
Search
Now showing items 1-10 of 186
Monte Carlo simulation of treatment machine Varian Clinac iX
(2010-08-12)
This report presents methods and results from the development of a Monte Carlo
model of a Varian Clinac iX linear accelerator of nominal energy 6 MV . The simulations
are made by the BEAMnrc/EGSnrc Monte Carlo code package ...
Trust and Capabilities: Experiences from Rwanda’s Informal Financial Institutions
(2015-12-10)
This thesis examines the role of informal financial institutions in the construction of trust between Rwandans as well as their influence on their livelihood. For many years Rwandans have suffered from ethnic conflict and ...
Democracy in Action: Decentralisation in Post-Conflict Cambodia
(2012-01-27)
The process of democratisation in post-conflict Cambodia has been problematic. Almost two decades after the UN-led intervention in 1993, democracy in Cambodia remains shallow, as evidenced by various studies. Three main ...
Ghostlines: Movements, Anticipations, and Drawings of the LAPSSET Development Corridor in Kenya
(2020-10-15)
The Lamu Port-South Sudan-Ethiopia-Transport (LAPSSET) corridor is a partly completed development corridor in Kenya that will connect the eponymous places via roads, pipelines and railway lines, if completed. This thesis ...
Peacebuilding in Post-Genocide Rwanda: The Role of Cooperatives in the Restoration of Interpersonal Relationships
(2009-11-25)
This thesis is aimed at contributing to the lack of knowledge in the field of peacebuilding from below, notably regarding the mechanisms to be used in order to overcome the painful past between conflicting parties. The ...
Prefacio
(2004)